Interior fitout company in Dubai, done in the right order.

Fajr Interiors is an interior fitout company in Dubai, carrying design, approvals, build and furniture on one contract since 2011. If you are comparing interior fitout contractors in Dubai, settle who files the approvals before you compare a single price. Approvals decide the dates, and a bid that leaves them to you is pricing a different job.

Office floors of 2,000–20,000 sqft50+ projects since 2011Every check here applies to us too

Fluted timber reception desk against a dark panelled wall, Global Textiles office, Opus Tower, Dubai
Reception desk · Global Textiles, DubaiPhoto
On the record
Fajr InteriorsOur own answers to the first checks
Trade licence
648890Interior contracting
Dubai Municipality
G+1Approved contractor
Since 2011
50+Projects, villas and offices
Tower approved lists
FourOne Za’abeel, Vision, Opus, Emaar Square
Office floors
2,000–20,000Sqft, the scope we take on

The Fajr film · 1:05

Watch the company before you read the bid.

One minute inside our studio and on our sites: the plans, the surveys, the crews and the villas and offices we hand over. The people in the film are the people who would run your fitout.

One contract or two

One contract or two, and what each one costs you.

Every fitout runs on the same drawings. What differs is how many contracts stand between the drawing and the finished wall. A split between a design firm and a contractor suits a frozen scope and a client with time to referee. Design and build suits a fixed date, an occupied floor and made joinery.

Two contracts compared with one design-and-build contract
The questionTwo contractsDesigner, then contractorOne contractDesign and build
01What it suitsAn in-house design team already under contract, a scope frozen before tender, and time to referee two firms.A fixed move-in date, an occupied floor, made joinery, and a budget with little room for variations.
02What it costs youTime and claims. Every clash between drawing and site crosses a contract line, and each crossing has a price.A tender on the design itself. That is why we price against a drawing set you can put in front of anyone.
03Who files the approvalsOften nobody by name. The designer draws, the contractor builds, and the filing falls between them.The party that answers for the dates, inside the contract.
04Where MEP sitsOften a separate subcontract, with a contract line through the ceiling void.Coordinated with partitions, ceilings and joinery before anything is made.
05Who answers for the programmeTwo programmes, each right about its own part.One programme, set against your lease.

Design and build gives up one thing: a second opinion on the design from a separate firm. We answer that by pricing line by line, so the number can be read beside any other bid. How the one contract runs on an office floor →

What a fitout company carries

What a fitout company carries, in one list.

An interior fitout company takes a leased shell to an occupied floor, and its fitout services run from design and approvals to the handover file. On one contract that means design and approvals, then partitions, ceilings, flooring, MEP alterations and joinery, then furniture, IT and AV, and finally the handover file. What the landlord hands you first sets how much of that list is yours to buy.

Shell-to-occupied

  • Partitions
  • Ceilings
  • Flooring
  • MEP alterations
  • Joinery

Turnkey adds

  • FF&E
  • IT
  • AV
  • Automation
  • Appliances

Around both

  • Design and technical drawings
  • Landlord and authority approvals
  • The handover file

Shell, Cat A and Cat B are defined on their own page: Cat A and Cat B, explained →

One floor, one contract

What one contract carried on a delivered floor.

Glazing, lighting controls, furniture and a wellness room on IMI’s executive floor at One Za’abeel: designed, approved, built and furnished by one team, against a move-in date that did not move.

See the IMI project
Double-glazed acoustic glassBoardroom and meeting rooms
Switchable glass and lightingRoom controls built in
Steelcase on sit-stand desksThe open work floor
A fitness room with a showerWellness, inside the office

Choosing a fitout contractor

How to compare interior fitout companies in Dubai: seven checks before the price.

Fitout companies in Dubai rarely fail on ambition. They fail on licence classification, on approvals nobody owned, and on lines that were never in the bid. What the best interior fitout companies in Dubai have in common: their own trade licence, their own authority registrations, approvals filed in their name, an itemised bid and a handover file. Run these seven checks on every contractor on your list, including us, and treat the price as the eighth item rather than the first.

  1. 01

    Licence classification

    The trade licence should name interior contracting, and its classification should cover the works in your scope, not only decoration.

    Our answer

    Trade licence 648890: interior contracting, G+1 approved contractor with Dubai Municipality.

  2. 02

    Registrations

    The contractor should be registered where your building is governed. One that is not learns the portal on your programme.

    Our answer

    Emaar, Nakheel, DDA, Trakhees, Dubai Municipality and Dubai Civil Defence; the DMCC, DIFC and JAFZA free zones.

  3. 03

    Who files the approvals

    “We assist with approvals” usually means you file them. Ask whose name goes on the submission.

    Our answer

    We prepare and submit the landlord, authority and Civil Defence packages, inside the contract.

  4. 04

    Where MEP sits

    Inside the contract, MEP is a design input. As a separate subcontract, every clash in the ceiling void becomes a claim.

    Our answer

    MEP alterations sit in our contract, coordinated with partitions, ceilings and joinery before anything is made.

  5. 05

    Quotation completeness

    Count the lines before you compare the totals. A missing line is not a saving; it is a variation with a date on it.

    Our answer

    Itemised line by line against drawings. Run the bid audit below on ours, as you would on anyone’s.

  6. 06

    Occupied-floor pricing

    If your team stays in, phasing, out-of-hours trades and staged switchovers belong in the first price, not in a later one.

    Our answer

    The phasing plan is agreed before we mobilise and priced with the rest of the scope.

  7. 07

    The handover file

    As-built drawings, test and completion certificates, O&M manuals. Ask to see the index from a finished job.

    Our answer

    Systems tested, snags closed and the file issued at the end of the furnish stage. Ask us for an index.

08Then the price. Compare totals once the scopes match, line for line. A cheaper total on a thinner scope is a dearer project, delivered late.

On site

Checked on the floor, not only on paper.

Before a price is fixed, we mark the plan out on the slab and walk it; while the floor is built, we are on it. The first film is site verification on our own HQ floor. The others are from an executive floor at Opus Tower, as it went up.

How we walk a plan before you sign it
Site verification, Fajr Interiors HQThe drawing checked against the laser line
Curved glass, before the film comes offOpus Tower
Glass partitions going inOpus Tower
Site meeting as the joinery goes upOpus Tower
Framing the ceiling canopyOpus Tower
Above the ceiling: services and acoustic bafflesOpus Tower

Bid audit

Bid audit: six lines cheap bids leave out.

Two quotations for the same floor can describe two different jobs. Before you compare totals, check each bid for six lines: approvals, MEP alterations, fire and life safety, out-of-hours working, making good, and furniture installation. A missing line is not a saving. The work still has to happen, and it returns mid-build as a variation.

Bid audit · six linesTick each line the bid names in writing
Six lines that go missing from fitout bids, with a tick box for each of two bids
No.The lineWhat it coversBid ABid B
01Approvals and authority submissionsLandlord NOC, authority submissions and Civil Defence: the filing work and its fees, owned by a named party.
02MEP alterationsCooling, power and data moved to suit the layout, priced against the design rather than parked in a provisional sum.
03Fire and life safetyDetection, alarm and suppression works to Civil Defence requirements. Often excluded, rarely avoidable.
04Out-of-hours workingLoud trades after hours, weekend switchovers and building-management supervision, as an occupied tower requires.
05Making goodReinstating the base build where the works touch it, and the condition your lease says you hand back.
06FF&E delivery and installationReceiving, lifting, assembly and setting out. Furniture bought is not furniture installed.
Lines missing66

Your two bids, counted

Bid A

6of 6 lines
missing

Bid B

6of 6 lines
missing

Compare the totals only when both bids read zero missing. Until then, the cheaper number may simply be the shorter list.

Both bids name all six lines. The totals now describe the same job, so they can be compared.

No prices go in here, and nothing you tick leaves this page.

Label your quotations A and B, whoever sent them, ours included. A line counts as named when it appears as its own item or inside a described one, not when it sits in the exclusions.

On film · Zeeshan Patel

“Don’t fall for the lowest number.”

Compare the exact scope, the materials and who is actually managing your site. That is where the real cost hides.

Registrations and approved lists

The register: licence, authorities, free zones and towers.

A fitout contractor should hold its own registrations wherever your building is governed. Ours: trade licence 648890 for interior contracting, G+1 approved contractor with Dubai Municipality; registered with Emaar, Nakheel, DDA, Trakhees, Dubai Municipality and Dubai Civil Defence; working in the DMCC, DIFC and JAFZA free zones; and on four tower approved lists.

AAuthorities and master developers

  • Dubai Municipality

    Trade licence 648890, interior contracting; G+1 approved contractor.

  • DDA

    Registered for fitout submissions in Dubai Development Authority districts.

  • Trakhees

    Registered for submissions inside its jurisdiction.

  • Dubai Civil Defence

    Fire and life safety approval, where a layout changes.

  • Emaar

    Registered contractor with the master developer.

  • Nakheel

    Registered contractor with the master developer.

BFree zones

  • DMCC

    DMCC

    JLT and the DMCC district. Free-zone registration.

  • DIFC

    DIFC

    Dubai International Financial Centre. Free-zone registration.

  • JAFZA

    JAFZA

    Jebel Ali Free Zone. Free-zone registration.

CTower approved lists

Many towers admit only the contractors on their own list, so check the list before you shortlist. Ask any contractor, us included, for the licence and registration numbers in writing.

What it costs

What a fitout costs, and why we price against drawings.

Three numbers, three scopes

An office fitout in Dubai starts at AED 350 per sqft for shell-to-occupied — partitions, ceilings, flooring, MEP alterations and joinery. Turnkey, with FF&E, IT, AV, automation and appliances included, runs AED 600–850 per sqft. IMI at One Za’abeel landed at AED 840 per sqft; Opus by Omniyat, in its final weeks before handover, is contracted at AED 726.

Per sqft of floor area · planning bands, not a quotation

What moves a floor inside the band

  • 01PartitionsHow much of the floor is glazed rather than solid.
  • 02JoineryHow much is made in a workshop rather than bought in.
  • 03Meeting roomsThe AV, and how many rooms carry it.
  • 04FurnitureThe specification of desks, seating and storage.
  • 05ServicesHow far the MEP must move to suit the plan.

We price against drawings, not against a rate. A rate quoted before the drawings exist is a planning band. The quotation is itemised line by line against the drawing set, so it can sit beside any other bid on the same scope.

How a fitout is priced →

Proof

Two executive floors, one finished and one in its final weeks.

Two floors show the method on real numbers. IMI at One Za’abeel is 5,000 sqft for AED 4.2M over 28 weeks, finished and in use. Opus by Omniyat, 6,200 sqft, is contracted at AED 4.5M on a 24-week programme and is in its final weeks before handover. Both run on one contract, from client brief to handover.

Render of the wellness room at IMI, One Za’abeel, DubaiRender

Delivered

IMI at One Za’abeel

Enclosed offices, sit-stand desks, a wellness room, a kitchen and a boardroom. Three layout options and fifteen planning rounds to a signed plan, against a move-in date that could not move.

“Great feeling walking into this beautiful office.”

Fabian Munz · IMI, One Za’abeel
Area
5,000 sqft
Value
AED 4.2M
Programme
28 weeks
Rate
AED 840/sqft
Instagram post: Opus Tower office fitout, joinery in progress, DubaiInstagram

Under construction · final weeks

Opus by Omniyat

Turnkey, from client brief to handover. A floor with little natural light, planned with glass partitions so borrowed light reaches the core. Joinery is going in now.

Joinery going in, on Instagram →

Area
6,200 sqft
Contract
AED 4.5M
Programme
24 weeks, contracted
Rate
AED 726/sqft

Delivered · 8 December 2024

IMI at One Za’abeel, photographed.

The executive floor as it was handed over, on the date the programme was built around, and the client on what it felt like to walk into it.

The full IMI project file
The boardroom, IMI at One Za’abeel, office fitout by Fajr Interiors, Dubai
The boardroom
The corridor and curved glass, IMI at One Za’abeel, office fitout by Fajr Interiors, Dubai
The corridor and curved glass
The social space, IMI at One Za’abeel, office fitout by Fajr Interiors, Dubai
The social space
The work floor and the company wall, IMI at One Za’abeel, office fitout by Fajr Interiors, Dubai
The work floor and the company wall
Lounge behind glass, IMI at One Za’abeel, office fitout by Fajr Interiors, Dubai
Lounge behind glass
Sit-stand desks under the timber ceiling, IMI at One Za’abeel, office fitout by Fajr Interiors, Dubai
Sit-stand desks under the timber ceiling
Ring pendants under the timber slats, IMI at One Za’abeel, office fitout by Fajr Interiors, Dubai
Ring pendants under the timber slats
Sitting area by the window, IMI at One Za’abeel, office fitout by Fajr Interiors, Dubai
Sitting area by the window
Glass offices along the corridor, IMI at One Za’abeel, office fitout by Fajr Interiors, Dubai
Glass offices along the corridor
Tables in the social space, IMI at One Za’abeel, office fitout by Fajr Interiors, Dubai
Tables in the social space
Fabian Munz, Managing Director, IMI Middle East“Great feeling walking into this beautiful office.”

Buyer’s FAQ

Questions buyers ask before they sign.

Interior fitout company FAQ — Dubai.

01What is the difference between a fitout contractor, a fitout consultant and an interior designer?

A fitout consultant advises and drafts: the brief, the drawings and the tender, but does not build. A fitout contractor builds what is drawn and runs the site. An interior designer designs the rooms. Design and build covers all three on one contract, so the team that draws the floor also builds it.

02Who should file the approvals for an office fitout in Dubai?

The party that answers for the programme. Approvals decide when work can start, so filing them belongs inside the fitout contract, not with the tenant. We prepare and submit the landlord, authority and Civil Defence packages ourselves, and we are registered with Emaar, Nakheel, DDA, Trakhees, Dubai Municipality and Dubai Civil Defence.

03Do we need a separate MEP contractor?

Not with us. MEP alterations sit inside the fitout contract and are coordinated with partitions, ceilings and joinery before anything is made. A separately appointed MEP contractor puts a contract line through the middle of your ceiling void, and every clash across that line turns into a discussion about who pays.

04How much does an interior fitout cost per sqft in Dubai?

Shell-to-occupied work, meaning partitions, ceilings, flooring, MEP alterations and joinery, starts at AED 350 per sqft. Turnkey, with FF&E, IT, AV, automation and appliances included, runs AED 600–850 per sqft. Where a floor sits inside that band depends on partitions, joinery, AV and furniture, and the quotation should be itemised against drawings.

05What should a fitout quotation include?

Every line of the scope, named, with the exclusions stated. Check six lines in particular: approvals and authority submissions, MEP alterations, fire and life safety, out-of-hours working, making good, and furniture delivery and installation. A bid that leaves them out is not cheaper. The work still has to be done. It should also state the defects liability period: Fajr’s is 12 months from handover.

06Can any fitout company work in any Dubai tower?

No. Many towers admit only contractors on their own approved list, and each authority and free zone registers the companies that submit to it. Check both before you shortlist. We are on the approved lists at One Za’abeel, Vision Tower, Opus Tower and Emaar Square, and work in the DMCC, DIFC and JAFZA free zones.

07Who are the best interior fitout companies in Dubai?

The best interior fitout company for your floor holds its own trade licence and authority registrations, files the approvals in its own name, prices an itemised bid against drawings and hands over a complete file. Fajr Interiors has worked this way in Dubai since 2011, under trade licence 648890 and as a G+1 approved contractor with Dubai Municipality.

Start in the right order

Settle the approvals first. Then compare the price.