The landlord’s fitout guide
The rules for works on the floor: what may be altered, what must be reinstated at lease end, and which drawings the landlord needs to see before anything starts.
Confirmed withLandlord
Office fitout · Abu Dhabi
An office fitout in Abu Dhabi runs through the same four stages we use in Dubai — space planning, approvals, build and furnish — under one contract, from our studio in Al Barsha. What changes is the building and the authority. Their requirements are confirmed at survey, before the programme is fixed and before anything is ordered.
Offices of 2,000–20,000 sqft · design, approvals, build and furniture under one contract
How it runs
Office fitout in Abu Dhabi — the programme, stage by stage.
We run an Abu Dhabi office fitout the way we run one in Dubai: four stages, in order, each closed before the next starts. Space planning takes 4 weeks, approvals 2–4, build 16–18 and furnish 2 — about 6–7 months in all. The approvals window is checked against your building and authority before we commit to it.

Headcount, workflow and lease dates, then a test fit and a signed plan. The survey of the Abu Dhabi floor happens here.

Landlord, building and authority packages, submitted on frozen drawings. The window is confirmed for the building first.

MEP, partitions, ceilings, joinery and finishes, in that order — phased around the building’s working-hour rules.

Furniture, snagging, commissioning and one dated move-in, set against your lease.
The weeks above are our published office programme. For an Abu Dhabi floor, the approvals window becomes a date only once the building and the reviewing authority are confirmed — the six checks below. The full process, stage by stage →
Before the programme
Every building sets its own fitout rules, and every emirate its own review path. Before we fix a programme for an Abu Dhabi floor, six things are confirmed in writing with the landlord, building management and the reviewing authority. Until they are, the approvals window is an allowance, not a date.
The rules for works on the floor: what may be altered, what must be reinstated at lease end, and which drawings the landlord needs to see before anything starts.
Confirmed withLandlord
Access, lift bookings, working hours, noisy-work windows and insurance requirements. They set how the build is phased, so they are fixed before the build weeks are.
Confirmed withBuilding management
Which authority reviews the fitout drawings for this building, what the submission must contain, and how long its review is expected to take. No Dubai route is assumed.
Confirmed withLandlord and authority
Whether the contractor carrying out the works must hold a registration or approval with that authority or on the building’s list, and what meeting it involves.
Confirmed withAuthority and building
What the civil defence review needs for the layout: egress, sprinklers, alarms and materials. Partition lines are not frozen until this is known.
Confirmed withAuthority
What the landlord hands over — raised floor, suspended ceiling, base cooling and lighting, sprinklers — checked on site against the drawings, so the Cat B scope starts from fact.
Confirmed withSurvey
Cost
Published bands, fenced by scope.
An office fitout in Dubai starts at AED 350 per sqft for shell-to-occupied — partitions, ceilings, flooring, MEP alterations and joinery. Turnkey, with FF&E, IT, AV, automation and appliances included, runs AED 600–850 per sqft. Our last two executive floors landed at AED 726 and AED 840.
These are our published Dubai bands. We publish no separate Abu Dhabi rate: an Abu Dhabi floor is priced on the same basis — surveyed, drawn, then quoted line by line — once the building’s requirements are known.
Proof · Dubai
Our proof is in Dubai. IMI at One Za’abeel ran 28 weeks from brief to handover at AED 840/sqft; Opus by Omniyat is contracted at AED 726/sqft and is in its final weeks before handover. Both followed the four stages above, with approvals inside the programme — the method we would bring to an Abu Dhabi floor.

File 01 · Dubai
Open the project →
File 02 · Dubai
Open the project →“Great feeling walking into this beautiful office.”
Abu Dhabi FAQ
Office fitout in Abu Dhabi — FAQ.
Design, drawings, procurement and the programme sit with our Dubai studio, under one contract. The floor is surveyed on site before design starts, and the landlord’s, building’s and authority’s requirements are confirmed before the programme is fixed. The four stages and their order are the same as for a Dubai office.
Our office programme is 6–7 months from brief to handover: 4 weeks space planning, 2–4 weeks approvals, 16–18 weeks build and 2 weeks furnish. For an Abu Dhabi floor, the approvals window is confirmed with the building and the reviewing authority at survey, before the programme is fixed.
It depends on the building. The landlord and building management approve the fitout first; then the authority with jurisdiction reviews the drawings, including fire and life safety. We confirm which authority applies, what it needs and whether the contractor must be registered with it, before we commit to dates.
An office fitout in Dubai starts at AED 350 per sqft for shell-to-occupied — partitions, ceilings, flooring, MEP alterations and joinery. Turnkey, with FF&E, IT, AV, automation and appliances included, runs AED 600–850 per sqft. Our last two executive floors landed at AED 726 and AED 840. We publish no separate Abu Dhabi rate.
Cat A is what the landlord hands over — raised floor, suspended ceiling, base cooling and lighting, sprinklers. Cat B is your office: layout, partitions, meeting rooms, joinery, branding, furniture, AV and the MEP alterations that make the plan work. An office fitout is, in practice, the Cat B scope.
Where the building allows it. We zone the works, hand each zone back before the next opens, and run loud trades out of hours. For an Abu Dhabi floor, the building’s working-hour and noise rules are confirmed first, because they decide how the build weeks are phased.

Start in the right order
Tell us about the building, the headcount and the lease dates. We confirm what the building and the authority require, then come back with a scope, a sequence and a number.