CEO office delivered by Fajr Interiors for ASI, Dubai

Workplace / Dubai

ASI at Novotel.

ASI’s Dubai office, at Novotel, is a floor we designed and built for the AlSubeai group: a CEO office, a stone-walled boardroom, a reception lounge under a sculpted lit ceiling and an executive lounge.

ASI · Novotel

NovotelBuilding
DubaiCity
ASIClient

Project context

The building, the client, the floor.

ASI is the AlSubeai group’s office in Dubai, at Novotel; the group’s head office in Jeddah is a separate project we also delivered. The Dubai floor carries the CEO office, the boardroom, the meeting rooms and two lounges shown below.

Client
ASI
Building
Novotel
Location
Dubai
The finished office · reception, the CEO office, the boardroom and the meeting room1:27 · with sound

Project film

Walk the office, reception to boardroom.

A walkthrough of the finished ASI office in the order a visitor meets it: the reception under the polygonal light feature, the CEO office with its world-map wall, the boardroom with its book-matched marble wall, and the meeting room. The pieces and finishes are named on screen as the camera passes them.

See the gallery
ProgrammeThe order of work

Programme · done in the right order

Survey to handover, in the right order.

An office fitout runs in four stages: survey and brief, design with the landlord and authority approvals in parallel, the build, and the handover. Our recent office floors run on 24- to 28-week programmes: IMI at One Za’abeel took 28 weeks from start to keys, and Opus by Omniyat is contracted at 24.

  1. 01

    Survey and brief

    Measured survey, the client’s headcount and ways of working, and a signed brief before layouts start.

  2. 02

    Design, approvals in parallel

    Layouts, finishes and services drawings, with the landlord and authority approvals run alongside rather than after.

  3. 03

    Build

    Partitions, MEP, ceilings, joinery and finishes, trade by trade, against a dated programme.

  4. 04

    Handover

    Snagging, furniture and the walkthrough, then the keys.

The four stages are how every office we deliver is run.

InvestmentWhat it cost, fenced by what it covers

Investment

How an office like this is priced.

For planning your own floor, our office bands run from AED 350 per sqft for shell to occupied, and AED 600–850 per sqft for a turnkey fitout including furniture. Every office is priced on its own scope.

Office bands

AED 600–850 / sqftTurnkey fitout band. From AED 350 per sqft shell to occupied

An office like this? Start with the building and the brief.

Bands for planning, not a quotation. Every office is priced on its own scope.

QuestionsWhere, what, size, cost

FAQs

Questions we get. Answered.

The questions clients ask most about the ASI office. Every price is stated with the scope it covers.

Is ASI the same client as AlSubeai Investments?

Yes, the same group. ASI is its Dubai office and AlSubeai Investments its head office in Jeddah. We delivered both, and each has its own project page.

How do I start an office fitout like this one?

Send us the building, the floor area and how your team works, through the Estimate page or WhatsApp. We map the scope, the landlord and authority approvals and the programme before detailed pricing.

What does the ASI office include?

A CEO office, a stone-walled boardroom, meeting rooms, a reception lounge under a sculpted lit ceiling and an executive lounge. Every frame in the gallery is a photograph of the finished office.

How much does an office fitout like this cost in Dubai?

This project’s value is not published. For planning your own floor, our office bands run from AED 350 per sqft for shell to occupied, and AED 600–850 per sqft for a turnkey fitout including furniture. Every office is priced on its own scope.

How long does an office fitout like this take?

It runs in four stages: survey and brief, design with the landlord and authority approvals in parallel, the build, and the handover. Our recent office floors run on 24- to 28-week programmes: IMI at One Za’abeel took 28 weeks from start to keys, and Opus by Omniyat is contracted at 24.

Who handles the landlord and authority approvals?

We do, under the same contract as the design and build, and the approvals run alongside the design rather than after it. We are a G+1 approved contractor with Dubai Municipality, registered with Emaar, Nakheel, DDA, Trakhees and Dubai Civil Defence, and we work in the DMCC, DIFC and JAFZA free zones.

What happens after handover?

Snagging, furniture and the walkthrough come before the keys. After that, our contracts carry a 12-month defects liability period from handover.

Can’t find what you’re looking for?Our team is here to help with anything you need to know.
Call us800 3257
Email ushello@fajrinteriors.com
WhatsApp usMessage the studio

Start in the right order

Your floor. Done in the right order.

Tell us the building, the floor area and how your team works. We will map the scope, the landlord and authority approvals and the programme before detailed pricing.

Trade licence 648890 · Interior contracting, G+1 approved contractor (Dubai Municipality) · Registered with Emaar, Nakheel, DDA, Trakhees, Dubai Civil Defence · DMCC, DIFC and JAFZA free zones