FAJRINTERIORS
International Materials office at Opus by Omniyat: glass-walled offices along a timber-floored corridor with a screen shelf

Workplace / Opus Tower

International Materials at Opus Tower.

International Materials’ office at Opus by Omniyat, Business Bay, is one of three tenant floors we have delivered in the tower. Photographs, floor area, programme and project value are being gathered.

International Materials · Opus by Omniyat

Opus by OmniyatBuilding
DubaiCity
International MaterialsClient

Project context

The building, the client, the floor.

International Materials is one of three tenants at Opus by Omniyat whose floors we have delivered, alongside Global Textiles and the 6,200 sqft office on the Opus project page. Photographs of the finished office, floor area, programme and project value are still being gathered.

Client
International Materials
Building
Opus by Omniyat
Location
Business Bay, Dubai
ProgrammeThe order of work

Programme · done in the right order

Survey to handover, in the right order.

An office fitout runs in four stages: survey and brief, design with the landlord and authority approvals in parallel, the build, and the handover. Our recent office floors run on 24- to 28-week programmes: IMI at One Za’abeel took 28 weeks from start to keys, and Opus by Omniyat is contracted at 24.

  1. 01

    Survey and brief

    Measured survey, the client’s headcount and ways of working, and a signed brief before layouts start.

  2. 02

    Design, approvals in parallel

    Layouts, finishes and services drawings, with the landlord and authority approvals run alongside rather than after.

  3. 03

    Build

    Partitions, MEP, ceilings, joinery and finishes, trade by trade, against a dated programme.

  4. 04

    Handover

    Snagging, furniture and the walkthrough, then the keys.

The four stages are how every office we deliver is run.

InvestmentWhat it cost, fenced by what it covers

Investment

How an office like this is priced.

For planning your own floor, our office bands run from AED 350 per sqft for shell to occupied, and AED 600–850 per sqft for a turnkey fitout including furniture. Every office is priced on its own scope.

Office bands

AED 600–850 / sqftTurnkey fitout band. From AED 350 per sqft shell to occupied

An office like this? Start with the building and the brief.

Bands for planning, not a quotation. Every office is priced on its own scope.

QuestionsWhere, what, size, cost

FAQs

Questions we get. Answered.

The questions clients ask most about the International Materials office. Every price is stated with the scope it covers.

Where is the International Materials office?

In Opus by Omniyat, Business Bay, Dubai, one of three tenant floors we have delivered in the tower.

What else have you delivered at Opus Tower?

Three tenant floors: International Materials and Global Textiles, both delivered, and the 6,200 sqft office on our Opus project page, in its final weeks before handover.

How do I start an office fitout like this one?

Send us the building, the floor area and how your team works, through the Estimate page or WhatsApp. We map the scope, the landlord and authority approvals and the programme before detailed pricing.

Why are there no photographs of the finished office yet?

Photographs of the finished office, the floor area, the programme and the project value are still being gathered. They will be added to this page as they arrive.

How much does an office fitout like this cost in Dubai?

This project’s value is not published. For planning your own floor, our office bands run from AED 350 per sqft for shell to occupied, and AED 600–850 per sqft for a turnkey fitout including furniture. Every office is priced on its own scope.

How long does an office fitout like this take?

It runs in four stages: survey and brief, design with the landlord and authority approvals in parallel, the build, and the handover. Our recent office floors run on 24- to 28-week programmes: IMI at One Za’abeel took 28 weeks from start to keys, and Opus by Omniyat is contracted at 24.

What happens after handover?

Snagging, furniture and the walkthrough come before the keys. After that, our contracts carry a 12-month defects liability period from handover.

Can’t find what you’re looking for?Our team is here to help with anything you need to know.
Call us800 3257
Email ushello@fajrinteriors.com
WhatsApp usMessage the studio

Start in the right order

Your floor. Done in the right order.

Tell us the building, the floor area and how your team works. We will map the scope, the landlord and authority approvals and the programme before detailed pricing.

Trade licence 648890 · Interior contracting, G+1 approved contractor (Dubai Municipality) · Registered with Emaar, Nakheel, DDA, Trakhees, Dubai Civil Defence · DMCC, DIFC and JAFZA free zones